I need 23 holes dug out with a digger / post hole auger for retaining and fence work on clay ground. The area needs to be scraped back a bit to remove some metal fill and spoil removed from site after. 13 x 400mm D / 1.2m Deep 4 x 400mm D / 900mm deep 6 x 300mm D / 1.2m deep
#1 | Tradie 1 |
|
16 jobs | No longer in contact |
#2 | Tradie 2 |
|
34 jobs | No longer in contact |
#3 | Tradie 3 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work