Construction of Timber Retaining walls Scope of works - Construct 3 x Retaining walls as per Building Consent Plans - Bores range 300-450mm with 150 to 250 dia poles - Construct Timber Barrier at lower boundary wall - Install drainage material & Drainage coil to outlet - Backfill with Polyrock / Expol or similar NOTE 1.Works to exclude Topsoil supply / Install 2. The following materials will be free issued - (not to be priced) - Timber Poles - Timber Rails - Polyrock / Expol - Geofabric Material ONLY LBP Contractors Works require Council inspection & contractor to provide PS4 Site is currently cleared of vegetation / topsoil Survey boundary has been setout Plan works to commence after demolition of existing Concrete walls (separate works) Retaining wall works to start from May -June Will email full Building Consent Drawings file Available to meet onsite from 12th - 19th March Also have Concrete wall demolition works available to quote if interested in both jobs
#1 | Tradie 1 |
|
10 jobs | No longer in contact |
#2 | Tradie 2 |
|
8 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
#5 | Tradie 5 |
|
35 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 |
|
4 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work