After the recent cyclone/ flood our existing tank has to be moved a short distance from the edge of the land slip. Would you be interested in quoting for: 1. the creation of a new pad, 2. levelling up a slightly sloping section (600-700mm) drop, 3. building 7 meters of inexpensive retaining, 4. creating trenches to install the inlet pipes, from the existing down pipe, 5. lifting the tank from existing to the new pad. 6. reconnecting the supplies. I ve got permission to be off work on Wednesday this week, if you could make a site visit on the Wednesday that would be great. Thanks