The front entry retaining wall and associated concrete path requires bracing with additional posts and a new concrete path. Remove existing concrete path on top of retaining wall and a section of driveway for new retaining wall poles. Bore holes and brace poles in ground for inspection. Reinstate path and driveway. Driveway retaining wall has a gap between the timber retaining wall and the concrete slab to be filled with a suitable flexible sealant installed on a PEF backing rod.
#1 | Tradie 1 | No recent reviews | 45 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 17 jobs | No longer in contact |
#3 | Tradie 3 |
|
271 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work