We are required to strengthen our existing retaining wall. To do this we required the digging of 14 400mm by 2200mm holes for round 200 SED poles treated to H5 The poles are to be placed in the holes and concreted in place with 17.5 MPA grout When checked a 1 metre fence is to be erected on top of the existing wall.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 05-05-2018
Tradesperson reply
"Great job thanks heaps"