Review

Fill hole, reinstate paving

Job image

Job description

Paving
Mangere, Manukau

Published on 22 October 2024

Washout of paved footpath due to ruptured water main. Hole needs filling and concrete pavers reinstated on sand bed. Also, numerous other locations around the site where pavers have sunk need attending to.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Arrived at the agreed time and performed the original task, and extras as directed.

Work carried out by the owner/operator
Reviewed on 30 October 2024

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo