Published on 25 September 2024
Lay approximate 18m2 of --- pavers at the same level as the current deck. Pavers would be Volcanic Ash Firth Pavers or equivalent product. Edge of the pavers should line up with the deck and the vertical timber (as per the photos). Soil can be kept at the rear of the site.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 1 December 2024
Partner with Builderscrack
Get work