wanting steps down a bank, have already dug them out, approx 6 steps, but they need finishing off with risers etc. Some trees to be chainsawed. These trees are down a bank reached by using the above mentioned steps. For the trees probably half a days work for the sawing as the wood could be left in a pile nearby. However could be taken away and used as fire wood.
#1 | Tradie 1 | No recent reviews | 109 jobs | No longer in contact |
#2 | Tradie 2 |
|
279 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 5 jobs | No longer in contact |
Partner with Builderscrack
Get work