We need an installation done for us in Havelock North. We will ship the grass and Geotek down to the local depot and need the following complete on-site: - final site check to confirm area measurements and requirements - lay and install geotek over subbase. (dig out of topsoil already done) - up to 125-150mm of Gap7 Aggregate substrate to be supplied, compacted and screed. - cut join and install artificial grass (plan provided) - brush infill sand into the product (7KG per M2)
Partner with Builderscrack
Get work