We have 54m3 of bark arriving to replace our matting for our kōhanga playground. We need the matting to be pulled up, and the bark to be applied to the area 19.81x9.5m probably with an edging put in aswell around the area (59m). We are wanting this to be done in the school holidays. Removal of the matting can be done at earliest convenience. We will arrange delivery of bark once that has been completed.
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
#2 | Tradie 2 |
|
0 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 |
|
18 jobs | No longer in contact |
#5 | Tradie 5 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work