Site scrape and clean at the front of the property (either side of council footpath) plus spreading topsoil that is already on site in the back yard to level lawn. There will likely be some dirt that needs to be taken away. Last step is to Ready Lawn the property. Circa 150m2 of lawn required.
#1 | Tradie 1 |
|
34 jobs | No longer in contact |
#2 | Tradie 2 |
|
79 jobs | No longer in contact |
Partner with Builderscrack
Get work