We would like to have installed JakMatGeocell for our driveway and parking space in front of our house. This is JakMat Laying Instructions from --- 1. Prepare the base ground: Remove overburden and level ground as much as possible for an even surface. 2. Lay & compact the sub-base For vehicle traffic – JakMatGeocell: Lay a sub base of 150mm GAP40 for weight bearing capacity. Compact well with flat plate compactor/lawn roller. 3. Spread sand: Spread a 50mm layer of fi ne sand on top of the GAP 40 and compact lightly. 4. Lay interlocking JakMat: Lay JakMat while ensuring its interlocking is maintained. Standard hand or power tools can be used for cutting where required. 5. Fill the mat: Fill the cells with a suitable lawn mix and compact it into the cells. A small amount of excess above the mat should be allowed for compaction and settlement (10-15mm).
#1 | Tradie 1 |
|
79 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
Partner with Builderscrack
Get work