Published on 21 April 2016
Two terraced timber pole retaining walls are to be constructed to support the driveway and a flat land area below the driveway. Construction ideally to commence over May/June. Engineering Drawings Available upon request.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Job took longer than expected,but Scott and the team kept me well informed and went over and above the agreed scope of work which was much appreciated.
Work carried out by the owner/operator
Reviewed on 6 November 2016