Having recently constructed a deck on the rear of the house during heavy periods of rain, the builders walking back and forth have caused two strips 13 mtr x 1 mtr and 3 mtrs by 15 mtrs to be rough and uneven on a clay base. Looking to place a layer of topsoil, but uncertain if the clay base needs to be plough or dug out first so that it is even to walk on, grass and mow.
#1 | Tradie 1 |
|
12 jobs | No longer in contact |
#2 | Tradie 2 |
|
47 jobs | No longer in contact |
#3 | Tradie 3 |
|
73 jobs | No longer in contact |
#4 | Tradie 4 |
|
41 jobs | No longer in contact |
#5 | Tradie 5 |
|
67 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
#7 | Tradie 7 |
|
0 jobs | No longer in contact |
#8 | Tradie 8 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work