We have a lawn of approx 150 m2 that needs an average of 150mm of premium mix put down and leveled to prep for hydro seed. The job is now urgent Can deliver soil to top of drive but may be best to have a digger at the top of the drive and scoop it onto the back lawn then level
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great worker, polite, communicative and generally great to deal with.
Work carried out by the owner & subcontractors
Reviewed on 30-10-2023
Partner with Builderscrack
Get work