• Lift up bricks on small area of garden path • Cut back underlying roots taking care to preserve health of two small-medium sized trees • Prepare / even out ground underneath • Re-lay bricks adapting around any remaining roots near surface to avoid future buckling There is also a small job behind the house to re-attach loose bricks on steps. Time-frame: as soon as possible.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job - thanks.
Work carried out by the owner/operator
Reviewed on 18-08-2023
Partner with Builderscrack
Get work