We have a house on poles and need a set of about 6 steps to go from ground level to under the house. This probably means a higher fence rail on one side and a handrail. And also creating a gate at the top from a piece of removed fence. And another gate the same for the side of the house.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Parts of the job were trickier than anticipated. I appreciated that Ropata spent some of his own time researching solutions.
Work carried out by the owner/operator
Reviewed on 13-02-2023