Sand Play Project Requirements: " Excavate, retain, line and fill new sand play area. " Line bottom with 150-300 mm scoria or gravel and cover with shade cloth/weed matting. Add 500 mm fine grain sand - fine grain sand is recommended. " Approximate dimensions per following diagram (TBC on site). Play elements (ladder, logs etc) are not part of the requirements " Area to be roughly level with existing field, ground falls away to the Bench Seats/Covered walkway so some retaining will be required on that side.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Luis and his team were proactive, professional. The gardens that they produced look great and are exactly as per the brief. We would not hesitate to use them again.
Work carried out by the owner/operator
Reviewed on 04-05-2018
#1 | Tradie 1 | No recent reviews | 44 jobs | Secured job |
#2 | Tradie 2 |
|
55 jobs | No longer in contact |
#3 | Tradie 3 |
|
74 jobs | No longer in contact |
#4 | Tradie 4 |
|
28 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 17 jobs | No longer in contact |
Partner with Builderscrack
Get work