We need to have finished the installation of the insulation under our house. Some of the existing poly sheets fell out in the 2016 quake and need to be put back in and secured. Good access under the house with a max height of about 1m.
#1 | Tradie 1 |
|
77 jobs | No longer in contact |
#2 | Tradie 2 |
|
35 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work