Published: 14 August 2024
I have a roll of mass loaded vinyl that needs to be measured, cut, and attached (possibly using Velcro strips) to a couple of interior walls and windows. It will be installed on top of the wall, rather than inside the wall cavity. The goal is to soundproof these areas, so a tight seal is essential for effectiveness. I have all the necessary equipment for the project, which should take approximately 2-3 hours.
#1 | Tradie 1 |
|
1 job | Requesting contact |
#2 | Tradie 2 |
|
9 jobs | Requesting contact |
Partner with Builderscrack
Get work