The ceiling insulation in our home is 10 mm off what is required to meet the healthy homes standard. We require the existing insulation top be topped up with the minimum thickness of ceiling batt available to comply. The work can be done anytime, but needs to be completed by the first week of February. It is a modern home with good access.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
2.0
|
Communications |
3.0
|
The contract was won on delivery of the service, however, once accepted the delivery was altered not once but twice.
Work carried out by an employee of the company
Reviewed on 23-02-2022
Tradesperson reply
"Thank you for your review we are glad you are happy with the workmanship and cost. We apologies that the Install dates had to be changed, we put the health and safety of our installers and our customers at forefront of our operation especially during times such as these."
Partner with Builderscrack
Get work