My house has 80mm pink batts but needs to be topped up to meet healthy homes standards. It is a single story brick and tile in Papamoa and is approximately 180m2. It was built in approximately 2004. I would like to have the work completed as soon as possible (I think they allow time to meet the standard). The ceiling is easily accessible.
Partner with Builderscrack
Get work