Published on 11 July 2019
Job is to remove foil insulation and install new one. Underfloor 100% accessible and easy to acess. Timber gaps are mainly 45cm with some with 60cm Want also to get quotes for a moisture barrier installation. Tks Thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work, thanks Tom and the team!
Work carried out by the owner & subcontractors
Reviewed on 3 September 2019
Partner with Builderscrack
Get work