Supply and fit insulation under the floor. Accessible under the house, don't need to lift floors or anything. There is existing foil under the floor for most of the house. Not sure if that needs to be taken out or you can put the new pink batts or equiv over the top.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 10-06-2018
#1 | Tradie 1 |
|
31 jobs | Secured job |
#2 | Tradie 2 |
|
102 jobs | No longer in contact |
#3 | Tradie 3 |
|
32 jobs | No longer in contact |
Partner with Builderscrack
Get work