Ceiling insulation is required to be topped up. House is 150m2 including garage which does not have insulation and is not required. Currently Healthy Homes report has it at 80mm and in bad condition, need 120mm. Please note the whole roof was not accessed and assessed only from the access hole. Need quote asap
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Leon was great! I appreciated the heads up on a leak and the other things you found in the roof. Really over and above and a great competitive price. I thoroughly recommend Retropro to others!