90ms home that needs underfloor insulation. Not much space between the ground and the house though. 300mm at the smallest.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 28-07-2021
#1 | Tradie 1 |
|
63 jobs | Secured job |
#2 | Tradie 2 |
|
147 jobs | No longer in contact |
#3 | Tradie 3 |
|
34 jobs | No longer in contact |
Partner with Builderscrack
Get work