The majority of the subfloor needs to be insulated - marked up floor plan attached. The unhighlighted area was recently re-piled and insulated at that time. A moisture barrier is also required. A couple of photos attached showing clearance - it’s about 350mm from the ground to the bottom of the bearers, give or take, although haven’t been able to check the entire area.
#1 | Tradie 1 |
|
20 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work