Require a number of acoustic panels to be installed into the ceiling of classroom(s). These will require scaffold as the stud height is 5 meters in some parts of the room. Install would need to be done over the next school holidays in approx. 6 weeks.
#1 | Tradie 1 |
|
103 jobs | No longer in contact |
Partner with Builderscrack
Get work