Need supply and installation of approx 170 sq meters of 250 micron (or thicker) polythene moisture barrier on the ground under the house. This will also require preparing of the ground by raking out debris to ensure it does not damage polythene when installed. The installation should be to New Zealand Standard NZS. There is reasonable access under most of the house. Care needs to be taken not to damage existing insulation and piping. Contractor MUST have experience of installing polythene moisture barriers.
#1 | Tradie 1 | No recent reviews | 45 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
102 jobs | No longer in contact |
Partner with Builderscrack
Get work