The work required is to top up the insulation of the ceiling to meet the R2.9 requirement. The current insulation thickness is 100mm. The area to be insulated in 72m2 The roof is easily accessible. Thanks
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
#3 | Tradie 3 |
|
17 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
#5 | Tradie 5 |
|
148 jobs | No longer in contact |
#6 | Tradie 6 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work