Lots of the polystyrene underfloor insulation appears to have fallen down and needs to be secured into place. No time frame. This building is a Playcentre, so we would need to work together to arrange a suitable time. (School holidays or an afternoon)
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
1 job | No longer in contact |
#3 | Tradie 3 |
|
53 jobs | No longer in contact |
Partner with Builderscrack
Get work