Published on 29 September 2014
EQC repairs have cut access holes in the floor and revealed under floor Polystyrene blocks in part of the house. The sleeping area appears not to have been done. The crawl space is not very deep, from the bottom of the joist to ground is 45cm at one access and 49cm at the other. The time frame for getting it done is restricted as they will recover the floor as part of the repairs.
Partner with Builderscrack
Get work