Looking to get our underfloor insulation removed before getting the house treated for Borer. This must be done on Friday 06 SEP. Please do not respond if you can't do this job tomorrow! House is 120m sq regular polygon shape. Insultaion needs to remain in good condition so that it can be re-installed after treatment. There is a polythene ground sheet down and the insulation is polyester, attached by staple.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Raphy was very easy to arrange the job with and we talked through the methodology before he got started to make sure I was happy with what he was doing. Stuck to his cost estimate. Would hire again. Thanks.
Work carried out by the owner/operator
Reviewed on 17-09-2019
Tradesperson reply
"Thank you Reuben and Family.
It was a pleasure to do business with you. Swiss Build Aotearoa-Raphy"
Partner with Builderscrack
Get work