Supply and fit insulation underfloor. 1964 house on piles. Currently there is a moisture barrier installed and partial underfloor insulation in the form of bats covered with foil. Not sure if the current insulation would need to be removed and replaced or if we only need to do the areas not already insulated. Approx. 130 m2 floor plan in total. Looking to get it done around June 7-14th.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great communication. Made it very easy. Thanks.
Work carried out by the owner/operator
Reviewed on 12-06-2019
Tradesperson reply
"Great client, paid within 24hrs of completion of job."
Partner with Builderscrack
Get work