I have a brick home on piles built in the 1960s with good access under the floor, there is abit of rubbish under the floor but good ground clearance to move about.I after someone To put a moisture barrier on the ground under my house and tape the joins and piles to prevent moisture rising...roughly 130sqm, it could be a labour only job or supply and install. Thanks
#1 | Tradie 1 |
|
23 jobs | No longer in contact |
#2 | Tradie 2 |
|
53 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 4 jobs | No longer in contact |
Partner with Builderscrack
Get work