A new Daikin aircon system has been purchased and ready for installation. All parts are available, no parts supply is needed unless something has gone missing, which should not be the case. Internal unit is positioned in the ceiling on a stand. External unit is on a custom made concrete base on the right location. The system is new and never used. Purchased 3-4 months ago. What you will be expected to do: 1) Treat the units for sulfur (for internal unit, this can be done in the ceiling, there is enough space and light there) 2) Put piping in place (the distance between 2 units is approximately 5m in the ceiling and 2.5m outside down the wall, all accessible 3) Create openings in the ceiling (drawing attached) and connect all ducts 3) Electrical work can be done by you or not, we are flexible to get our electrician if you not do electricals 4) Test the unit and sign installation
#1 | Tradie 1 |
|
6 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work