Review

Chimney flue repair

Job image
Job image

Job description

Flue Install or Repair
Porirua

External fireplace with free standing flue pipe and cowl. Replace rusted out cowl with new stainless steel. Flue pipe was installed off vertical - remove flue pipe and reinstall. Flue has stainless steel 250 mm exterior trunking for appearance, can be reused. Job to be done over the next two months complete by the end of August.


Review

Workmanship
5.0
Cost
4.0
Schedule
4.0
Communications
4.0

Glenn replaced a flue on our outdoor fireplace. We wanted a nicely finished installation because it is a feature on our deck and it was a bit challenging to sort out some faults from existing. We are very pleased with the result, the flue is very smart and well finished, with excellent quality components. The job went exactly to plan in all respects, I would recommend these guys.

Work carried out by the owner/operator
Reviewed on 25-09-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo