Published: 9 July 2015
I have a woodburner in place and need the flue installed. The ceiling framing has been cleared away prior to jibing. This makes it easy job to punch through the jib and the galvanised roofing iron. The area of ceiling has only about a 700mm crawl space, so there is little access, other than via the holes to be cut for the jib and roofing. I have the flue parts already, rubber seal will need to purchased and there maybe some bracing for the top external part of the flue/chimney. The wood burner is a Tarras MkII, with a heat saver flue design. Viewing can be arranged after 430pm most weekdays, please call to arrange.
#1 | Tradie 1 | No recent reviews | 57 jobs | No longer in contact |
Partner with Builderscrack
Get work