Published: 12 July 2019
I have purchased a new heat pump and require installation. The install is not quite back to back. We are wanting it installed above a window and will be pulling the wall board off to insulate behind it and to install the pipes inside the wall instead of having them exposed externally. Therefore the job will require two visits. One to install the pipes and the other to install the unit after we have re-lined and paited the wall. The external unit will be installed on the other side of the same wall to the left of the unit if looking at it from inside. There is an existing concrete patio where the exterior unit will be installed.
#1 | Tradie 1 |
|
200 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 12 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 5 jobs | No longer in contact |
#4 | Tradie 4 |
|
40 jobs | No longer in contact |
#5 | Tradie 5 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work