Published on 17 May 2012
I have a 3 yr old 3 KW ? (smallish) Mitsi heat pump I'm rellocating from a red zone property in Dallington to another property in Sockburn. High wall install. The install is not exactly back to back, raqther, around the corner (about 1.5m) horitontal meters. Price can be decomissioning from existing location (which has no power), or new install only. Pref. date for install is about 29th-31st May. I have two there to decommission but only 1 to reinstall at this stage. Power already run to install location.
Partner with Builderscrack
Get work