Published on 1 April 2025
We want a new free standing Woodsman Kanaku woodburner installed. We've taken out the expired inbuilt log burner and pulled down the brick fire place. The inner flexible flue and 2 outer flues are stil in place and we prefer for the 2 existing outer flues and flashing in situ to be used if possible. We purchased a new flue kit from Mitre 10 with the new logburner, so have the new inner flue pieces to be fitted for the CCC permit. We want a fully qualified (SFAIT) Certified Woodburner Installer for the CCC permit. If interested, please reply so we can get the joob done asap. Thank you
Partner with Builderscrack
Get work