Active job

Wood Fire install

Job description

Wood Burner Installation & Repair
Carterton

I have a pellet fire i want removed and a new Woodsman Brunner wood fire with Heatsaver flue installed.The stud is 2960 high,the back of the flue on the roof is 2 metres from the diagonal ridge line.The pellet fire is on a tile hearth that used to have a wood burner before.The pellet fire is to go in my shed.


Trade professionals

#1 Tradie 1 No recent reviews 26 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo