I have 4 no. 2 round posts that are concreted in the ground that need routing out/notching out. The pots needs the whole way to the ground (about 1500mm)
#1 | Tradie 1 |
|
39 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work