Published: 1 October 2020
undertake the job in the week of 12 - 16 October • Prepare and lay a reinforced concrete pad --- • Position a 2,000 litre Slimline watertank • Connect to adjacent downpipe and fit overflow materials will be provided
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 12-11-2020
#1 | Tradie 1 | No recent reviews | 10 jobs | Secured job |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 15 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 43 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 5 jobs | No longer in contact |
#6 | Tradie 6 |
|
105 jobs | No longer in contact |
#7 | Tradie 7 |
|
133 jobs | No longer in contact |
Partner with Builderscrack
Get work