Active job

hardboard prep over shortpile carpet and then laying the lino - both supplied

Job description

General Handyman Tasks
Waitakere

Published: 5 September 2012

Hi, I have a need for someone capable of ...laying 4.75mm hardboard over a very short pile existing carpet in preperation for laying 4mm lino in my new shop location please. This is aTemp. floor to protect carpet during lease. I suspect the board will need to be stopped/plastered(?) and will need experience in lino laying. Not too tricky an area - a small square-ish area of around 32Msq. Easy access and currently can start work there in next 2-3 days empty space BUT, job MUST be completed by Thursday 20th September please. Thank you phil ---


Trade professionals

#1 Tradie 1 No recent reviews 13 jobs No longer in contact
#2 Tradie 2 No recent reviews 49 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo