We need weatherboards on sun exposed upper north facing room tidied and replaced as needed. Also vented louvre installed and insulation and inner of that wall lined. Scaffolding will be in place for contracter to paint soffits and barge boards at same time.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-04-2024
Partner with Builderscrack
Get work