I need a sump hole dug at the rear of the section to handle drainage from 2 sheds. It will have to be done manually. There is no access for a machine. Will be about 2m depth (possibly more) to get through the clay. Either a 2m square hole or perhaps 6 holes with a hand-held machine digger (depends on depth and diameter that can be achieved). Maybe half day manual labour. Can you help?
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Top work. Job was physically demanding and Joseph worked hard and efficiently on a very warm day. Delighted with the outcome.
Work carried out by the owner/operator
Reviewed on 20-02-2022
Tradesperson reply
"I’m glad I could help. I appreciate the support. Cheers, Berry construction."
Partner with Builderscrack
Get work