Long driveway on a bare lifestyle block. First 170m will need to be scraped then metalled and compacted, has a limestone base, and was "the original" accessway/race to the property. Second 100m is a new driveway thru a paddock up to the building site.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 |
|
16 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 6 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work