##### Profesional Block Layer required ##### I have removed a sliding door and its wooden frame from an internal basement block wall. The gape that has been left is 2 mtr wide by 2.4 mtr high. I require this gape to be blocked up. Pinned to the concrete floor in 2 maybe 3 places and to the walls at each end in 2 maybe 3 places with say 12mm rebar. I will be painting the new blocks and that will be their finished state. ##### Profesional Block Layer required #####
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 53 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work