Published: 17 November 2024
2 level deck, ground level, plastic, needs renovating. Upper wood 2 step needs to be blocked for pergola fitting.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Good work completed. Both Jake and his apprentice were courteous at all times.
Work carried out by the owner/operator
Reviewed on 26-11-2024
Partner with Builderscrack
Get work